# Projects

> Create, find, rename, share and version DDL projects: the Projects list, Project Settings, access levels, locking, Versions and deleting a project.

Source: https://dev.delman-guide.pages.dev/projects

A project is your workspace in DDL. It holds one pipeline and everything built on it: the connections it imports from and exports to, SQL queries, schedules, run history, charts and dashboards. Access is granted per project, so a project is also what you share with colleagues.

<Tour id="projects" />

> Screenshot: The Projects page in table view listing Demo Project, Regional Sales and Marketing Sandbox with owner and last-modified time. The Projects page: search and owner filter at the top, Create New and the list/grid switch on the right.

## Find a project

The **Projects** page (`/projects`) lists every project you own and every project someone shared with you. Open it with **View All** next to **Projects** on the Home page, or go to `/projects`. The rest of the app's menus are described in [Home and navigation](/navigation).

| Control | What it does |
|---|---|
| **Create New** | Creates a project immediately. See [Create a project](#create-a-project). |
| List / grid switch | Shows the projects as a table (tooltip **LIST**) or as cards (tooltip **GRID**). Both show the same projects. |
| **Search Project** | Filters by name. Any part of the name matches, in upper or lower case. |
| Owner filter | **Owned by anyone** (default), **Owned by me**, or **Not Owned by me** for projects shared with you. |
| **Reset Filter** | Clears the search and sets the owner filter back to **Owned by anyone**. |

The table has three columns. **Project Name** opens the project (so does a click anywhere on the row). **Owner** reads `me` for your own projects and shows the owner's name for shared ones. **Last Modified** is relative, for example "5 minutes ago"; hover the info icon next to it for the exact date and time. The most recently changed projects come first.

The grid shows one card per project with **Last updated** and **Owner**. An account without projects shows **There is no project to show**. On a phone, the table becomes one card per project.

:::tip[From the Home page]
The **Projects** section of the Home page shows your three most recently changed projects next to a **Create New Project** tile. The tile does exactly what **Create New** does.
:::

## Create a project

**Create New** does not ask for a name. DDL creates the project at once, calls it **Project 1**, **Project 2** and so on, and opens its empty Pipeline canvas.

1. On the **Projects** page, click **Create New**.
2. DDL opens the Pipeline canvas of the new project.
3. Give it a real name right away: open **Project Settings** and use [Change Project Name](#rename-a-project).

The number comes from a counter per account that only counts up: deleting **Project 3** does not free that name. Your e-mail address is put on the project's [failure e-mail list](#e-mail-notifications) automatically.

:::note[Free accounts]
A Free account can own at most two projects. A third **Create New** fails with "You may not create more than 2 projects".
:::

## Inside a project

The rail on the left of the project pages is the project menu. Click the menu icon at its top to expand it and read the labels; × collapses it again.

> Screenshot: The expanded project menu of Demo Project with Connections, Pipeline, SQL Query, Schedule, Monitoring, Charts, Dashboards and, at the bottom, Project Settings. The project menu, expanded on the Pipeline page. SQL Query and Schedule sit under Pipeline; Project Settings stays at the bottom.

| Menu item | Opens | Read more |
|---|---|---|
| **Connections** | **Manage Connections**, the project's import and export connections. Sub-item: **Custom Connector**. | [Connections](/connections) |
| **Pipeline** | The pipeline canvas at `/projects/<id>`. Sub-items: **SQL Query** and **Schedule**. | [Pipeline canvas](/pipelines), [SQL Query](/sql), [Schedules](/schedules) |
| **Monitoring** | The runs of this project and their logs. | [Monitoring](/monitoring) |
| **Charts** | The project's charts, built from its nodes and from datasets you can read; **New chart** opens the chart builder. | [Charts](/charts) |
| **Dashboards** | The project's dashboards; each opens on its own page, `/dashboards/<id>`. | [Dashboards](/charts-dashboards) |
| **Project Settings** | Name, failure e-mails, data retention, lock, sensitive data and deletion. | [Project settings](#project-settings) |

Sub-items appear only while you are in their section and the menu is expanded: **Custom Connector** on the Connections pages, **SQL Query** and **Schedule** on the Pipeline, SQL Query and Schedule pages. On a phone, open the project menu with the menu button in the top bar.

The Pipeline toolbar holds two more project-wide tools that this page covers: **Versions** and **Share**. On a phone they are in the **More project actions** (⋯) sheet as **Version history** and **Share project**.

## Project settings

Open **Project Settings** at the bottom of the project menu (`/projects/<id>/settings`). Each row shows a setting and its current value; click a row to change it.

> Screenshot: Project Settings of Demo Project with the rows Change Project Name (Demo Project), Email Notification (2), Data Retention Duration (7 days), Lock Project, Sensitive data (AI) with its switch off, and Delete Project. Project Settings. Each row shows its current value on the right; rows you may not change are greyed out.

| Row | Shows | Who can change it |
|---|---|---|
| **Change Project Name** | The current name | People with **Modify Project** |
| **Email Notification** | How many addresses get failure e-mails | People with **Modify Project** |
| **Data Retention Duration** | The retention in days, for example **0 days** | People with **Modify Project** |
| **Lock Project** / **Unlock Project** | Which of the two you can do now | People with **Modify Project** |
| **Sensitive data (AI)** | A switch, plus who marked the project and when | The owner or a superadmin. Shown only when AI is enabled. |
| **Delete Project** | (red) | The owner only |

The owner holds every permission. The other permissions are explained in [Access levels](#access-levels).

### Rename a project

1. In **Project Settings**, click **Change Project Name**.
2. Replace the name in the dialog.
3. Click **Save** or press <kbd>Enter</kbd>. Both do nothing while the name is empty or unchanged.

> Screenshot: The Change Project Name dialog with the name Demo Project in the text box and the Save button greyed out. Type the new name and press Enter or click Save.

The new name shows up in the breadcrumb, on the Projects page, in [Monitoring](/monitoring) and in the **Added From** column of the [Data Repository](/data-repository). Names are unique per owner: if you already own a project with that name, DDL refuses with "A project with name "…" is already exist".

### E-mail notifications

**Email Notification** is the list of addresses that get an e-mail when a run in this project fails. The owner's address is on it from the start.

1. Click **Email Notification**.
2. Type an address in **Enter email address** and press <kbd>Enter</kbd> to add it. Repeat for more addresses.
3. Click **Save**.

Each message has the subject "[DO NOT REPLY] DDL Error Notification". It names the project, the node (as **Dataset**), the job type, the time (in Western Indonesian Time, WIB) and the error, and it has the run's log attached. Queries you run in the [SQL Query](/sql) workbench never send these e-mails.

:::note
The help line in this dialog says the selected people "will be able to access this project". They will not: this list only decides who receives failure e-mails. To give someone access, [share the project](#share-a-project).
:::

:::caution[Ask your administrator if no e-mail arrives]
Failure e-mails are a deployment option and are off unless your administrator has turned them on and set up e-mail sending. See [Admin console](/admin).
:::

### Data retention and Versions

**Data Retention Duration** decides whether DDL keeps the previous data of a node when the node runs again and its data is replaced.

- **0 days**, the default: the previous data is discarded. [Versions](#versions) can then only show what the node holds now.
- **More than 0 days**: the previous data is backed up every time it is replaced, so you can look at it and export it in [Versions](#versions).

To change it, click **Data Retention Duration**, enter a number of days and click **Save**. The dialog reminds you that a long retention adds to your storage usage and billing.

### Lock a project

Lock a project that is finished and only needs to keep running on its schedules.

- Nobody can change a locked project, the owner included: **Add data**, **Transform**, **Transfer** and the connection actions are disabled.
- Its sync schedules keep running.
- Intermediate data that is not saved as a dataset is removed to save disk space. It is rebuilt on the next sync after you unlock the project.

To lock, click **Lock Project** in Project Settings, read the explanation and confirm with **Lock Project**. While the project is locked, the Pipeline toolbar shows a red **Project Locked** button. Hover it, click **Unlock Project** and confirm to unlock; the **Unlock Project** row in Project Settings does the same.

### Sensitive data (AI)

When AI features are enabled on your DDL, Project Settings shows **Sensitive data (AI)**. Switch it on to keep this project's data away from outside AI models: "Data of this project only goes to the company's own AI model (Settings > AI > AI Agent > Sensitive data). Without it, the AI does not read this data."

- Only the project owner or a superadmin can change the switch. A mark set by a superadmin can only be cleared by a superadmin.
- A project that reads a sensitive Data Repository table is sensitive automatically. The row then says "Sensitive because it uses a sensitive Data Repository table." and the switch is locked.
- The row shows who marked the project and when.

The company model and the data policy are set up in [AI settings and data policy](/ai-settings).

People without project access see only grouped numbers from sensitive projects and cannot **Export CSV** from those charts. You cannot create public links or embeds for sensitive dashboards. Share them with signed-in people instead; see [Share dashboards](/dashboard-sharing).

### Delete a project

1. In **Project Settings**, click **Delete Project**. Only the owner can.
2. Read the warning, "This action will delete your entire project and cannot be undone", and click **Delete Project**.

DDL marks the project for deletion, takes you back to the Projects page and removes the project, its nodes, its connections, its backed-up versions, its charts and its dashboards in the background. Shared dashboards, public links and embeds from that project no longer open. Datasets you saved from it to the [Data Repository](/data-repository) are kept, with the data they had.

:::caution[Deletion waits until no one imports its datasets]
If a node of this project is saved to the Data Repository and that dataset is imported as a node anywhere, deletion stops with "This project has dataset node(s) that is being used as a source connection node. Please delete that source connection node first." Delete those importing nodes, then delete the project again.
:::

## Share a project

Sharing gives other people, or everyone who has a certain role, access to the project. What they can do depends on the permissions you grant.

:::note[Availability]
- The **Share** button is shown to the project owner and to people who were granted **Share Project(View)**.
- Free accounts cannot share projects and cannot receive them. Depending on how your DDL is configured, Pro accounts cannot either; DDL then answers with an error such as "You may not share projects".
:::

1. Open the project's **Pipeline** and click **Share** in the toolbar (tooltip **Share Project**). On a phone, open **More project actions** (⋯) and choose **Share project**.
2. The **Share Project** dialog opens. The box at the top shows the team and role you are working in (**You are currently part of:**).
3. Click **Add New Access**.
4. In the first list choose **Members** (people) or **Roles** (everyone with a role). In the second list, **Select Member** or **Select Role**, search and pick one or more entries. Entries that already have access are not offered again.
5. Tick **Allow** for each permission to grant. **Search permissions** filters the list.
6. Click **Save**. DDL confirms with "New access added successfully" and the dialog goes back to the list of grants. To grant access to someone else straight away, click **Add Another** instead: it saves and empties the form.

> Screenshot: The Share Project dialog in add mode with Members chosen, Dana Analyst selected and the permission table with View Project and Modify Project ticked. Adding access: choose Members or Roles, pick the people, tick the permissions, then Save or Add Another.

The dialog lists the current grants on two tabs, **Members** and **Roles**, each with a search box. Every entry shows the person's role (or, for a role, its team) and the permissions granted; the owner is not listed. Open the ⋮ menu of an entry to **Edit** its permissions or **Delete** the grant; deleting asks for confirmation and cannot be undone. A tab with no grants says, for example, "There is no Member shared with this share project."

> Screenshot: The Share Project dialog on the Members tab listing Dana Analyst, role Analyst, with the permissions Modify Project and View Project. Current grants on the Members tab. The ⋮ menu of an entry edits or deletes it.

### Access levels

| Permission | What the person can do |
|---|---|
| **View Project** | Open the project and look at its pipeline, nodes, connections, runs, settings and every dashboard of the project without changing anything. DDL adds this permission to every grant automatically. |
| **View Project & Sync Source** | Everything in **View Project**, plus run a manual sync of the project's source nodes. They cannot change the project or its schedules. |
| **Modify Project** | Change the project: add data, transform, build schedules, add and edit connections, and change the name, failure e-mails, retention and lock in Project Settings. Create charts and dashboards, edit and delete any dashboard of the project, and manage public links and embeds where enabled and allowed by the data policy. |
| **Share Project(View)** | Open the **Share Project** dialog and add, edit or remove access for others. |

Some actions are kept for the owner: **Delete Project**, deleting a connection and, together with superadmins, the **Sensitive data (AI)** switch.

A dashboard can also be [shared on its own](/dashboard-sharing) without granting project access. A **Can edit** share lets someone change its layout, text, titles and existing filters and share it onward, but not add charts or new filter columns, delete it, or manage public links and embeds. Dashboard viewer accounts stay read-only. Superadmins can open any dashboard by address, but their lists still show only owned or shared dashboards, and they need **Modify Project** to create charts and dashboards. Division administrators get no extra dashboard rights. Dashboard access changes apply on the next request; an owner who loses **Modify Project** loses dashboard deletion, public-link and embed control, and their public links stop working until it is restored.

:::caution[Dashboard numbers use the chart creator's access]
Charts run with their creator's permissions, not the viewer's, so sharing a dashboard shares its numbers. People without project access see personal-data values as **•••** only while **Mask personal data** in **Settings › AI** is on. Turning it off unmasks dashboards, public links and embeds. Check the [sharing rules](/dashboard-sharing) before granting access.
:::

## Versions

**Versions** shows the data a node held at an earlier date and time and lets you export it. Open it with **Versions** on the Pipeline toolbar (tooltip **Project versions**), or on a phone with **More project actions** (⋯) › **Version history**. The page lives at `/projects/<id>/history`; **Back** returns to the Pipeline.

1. Choose a node in **Node name**. The list holds the project's nodes that store data.
2. Pick a date, today or earlier, and optionally a time.
3. Click **Preview**. It stays disabled until you have chosen a node and a date.

> Screenshot: The Versions page with the node orders_enriched, a date and a time selected, and a preview table of the node's data at that moment with 12 columns and 500 rows. Versions: choose a node, a date and a time, then Preview. Dump Data exports what you see.

DDL shows the data from the node's latest run that finished at or before that moment, with the row and column count below. The choice is kept in the page address, so you can bookmark it or send the link to someone who can open the project. Until you preview something the page says **Nothing to Preview**.

If no run of that node had finished by then, or the older data was not kept, DDL answers "There is no data in node … at …". Older data is only kept when [Data Retention Duration](#data-retention-and-versions) is above 0 days.

### Dump Data

**Dump Data** becomes available once a preview shows data. It opens the **Dump Data to...** panel:

| **Select Destination** | What you fill in | Result |
|---|---|---|
| **Download as File** (default) | **File Type** (`parquet`) and **File Name** | Your browser downloads that version as a Parquet file. |
| **Export Connection** | **Select Connection**: one of the project's [export connections](/connections), or **Add New Sink** at the top of the list. Then the destination's fields. | DDL writes that version to the destination. **View Table** previews the destination first. |

Click **Confirm** to start.

## Troubleshooting

| Symptom | Cause | What to do |
|---|---|---|
| A project is called "Project 4" | **Create New** names projects automatically | [Rename it](#rename-a-project) in Project Settings. |
| "You may not create more than 2 projects" | Free account limit | Delete a project you no longer need, or ask your administrator about your account type. |
| "A project with name "…" is already exist" | You already own a project with that name | Choose another name. |
| **Share** is missing on the Pipeline toolbar | You are not the owner and lack **Share Project(View)** | Ask the owner to share the project with you with that permission. |
| Project Settings rows are greyed out | You lack **Modify Project**; **Delete Project** needs the owner | Ask the owner for access. |
| **Add data**, **Transform** and **Transfer** are disabled | The project is locked, or you lack **Modify Project** | [Unlock](#lock-a-project) it, or ask for access. |
| Versions says "There is no data in node … at …" | No run had finished by then, or older data was not kept | Pick a later time. Set [Data Retention Duration](#data-retention-and-versions) above 0 days to keep history from now on. |
| Delete Project says the project "has dataset node(s) that is being used" | A dataset saved from this project is imported somewhere | Delete the importing dataset nodes, then try again. |
| No failure e-mail arrives | Failure e-mails are off for your DDL, or e-mail is not set up | Ask your administrator. |

## Related pages

  - [Pipeline canvas](/pipelines): Add data, connect nodes and run the pipeline of a project.
  - [Data Repository](/data-repository): Datasets that any project can import.
  - [Connections](/connections): The import and export connections of a project.
  - [Teams and roles](/teams-roles): The roles you can share a project with.
