Charts
A chart shows numbers from one node or Data Repository dataset. It belongs to a project and can appear on several dashboards, which follow its changes and the source’s latest successful data.
Open the chart builder
Section titled “Open the chart builder”You can start in four places:
| Where | What to click |
|---|---|
| Project menu | Charts › New chart |
| Node page | Visualization, with that node already chosen |
| Dashboard editor | Add chart › New chart, which opens a new tab |
| AI answer | Save as chart; see Charts from AI answers |
A new chart opens at /projects/<id>/charts/new. Open a saved chart by clicking its name on the project’s Charts page.
Build a chart
Section titled “Build a chart”For Revenue by city, show the total amount for each city, highest first, using orders_enriched:
- Under Chart, enter
Revenue by cityas the name. Add a Description (optional) if it helps explain the chart. - Under Data, choose
orders_enrichedin Nodes of this project. - Under Chart type, choose Bar.
- Under Group by, choose
city. - Under Metrics, choose Sum and
amount. - Under Sort and limit, sort Sum of amount Descending and set Show up to to
10rows. - Check the Preview, switching between Chart and Data, then click Save.
DDL confirms Chart saved. Names must be unique within the project. The demo data has eight cities, so a limit of ten shows all eight.
Choose the data
Section titled “Choose the data”Data offers two groups:
- Nodes of this project: successful transform and SQL results, dataset nodes, uploaded files and imported tables. A source-connection node or transfer node is not a table to chart; choose the node holding its data.
- Datasets: Data Repository datasets you own or that were shared with you, up to 500.
Changing the source resets groups, metrics, filters and sorting. If the source is being updated, wait for its columns. If it has no successful data or no columns, run it first or choose another source.
Chart types
Section titled “Chart types”| Type | What it shows | Groups and metrics |
|---|---|---|
| Bar | Compare values across categories | Up to two groups and one to five metrics |
| Line, Area | Follow values along a date or another ordered group | One or two groups and one to five metrics |
| Pie | Parts of a whole; smaller slices join Other | Exactly one group and one metric |
| Number | One large number, optionally compared with the previous period | No group, or one date group; choose the number under Display |
| Table | Grouped numbers, or Rows of the source | Grouped: up to two groups and five metrics. Rows: one to 30 columns |
| Pivot | Cross two categories | Exactly two groups and one metric |
Group by and metrics
Section titled “Group by and metrics”Group by splits the numbers by up to two columns. A date column also offers Exact value, Day, Week, Month, Quarter or Year. For daily revenue, group order_date by Day, rather than plotting every timestamp.
Metrics offers Count, Distinct count, Sum, Average, Min and Max. Count with All rows counts rows; counting a column counts its non-empty values. Sum and Average need number columns. You can add up to five metrics.
Filters
Section titled “Filters”Chart filters keep only rows matching every condition. Add up to ten, choosing a column, condition and value. These belong to the chart and apply wherever it appears; dashboard filters narrow the result further for each viewer.
Conditions follow the column type. Text, number and date options are listed in Add filters; Boolean columns also offer is, is not, is empty and is not empty. is one of accepts up to 100 values.
Sort and limit
Section titled “Sort and limit”Choose up to three sort fields, each Ascending or Descending. Without an explicit sort, a date group sorts by time ascending; otherwise grouped numbers sort by the first metric descending. Source rows have no default sort.
Show up to accepts 1 to 1,000 rows, with 100 as the default. A First N rows badge means the result was cut at that limit. Raise the limit or add filters if you need more of the data.
Display
Section titled “Display”The available controls depend on the chart type:
| Type | Controls |
|---|---|
| Bar | Stack the series, Horizontal bars, Legend |
| Line, Area | Legend, and Dots on the line where offered |
| Pie | Donut, Legend, and Slices before “Other” (2 to 20, default 8) |
| Number | Number to show, Short numbers (1.2M) |
Switches may offer Automatic, On and Off. The palette follows light or dark appearance; there are no custom colour, axis-title or decimal settings.
The preview
Section titled “The preview”Preview redraws as you change settings. Use Chart to inspect the drawing and Data to check its rows. The footer gives the row count and Data as of time. A preview limit is not the total number of rows in the source.
For sensitive data, the preview warns that people who only see the chart through a shared dashboard get grouped numbers, never source rows. See Personal and sensitive data.
Change, copy or delete a chart
Section titled “Change, copy or delete a chart”Open Charts in the project menu (/projects/<id>/charts). Search charts finds a name; the list shows Name, Type, Used in, Owner and Updated. Used in says how many dashboards show it, or Not on dashboards.
- Click a chart to open it, or use ⋮ › Edit (Open for view-only access).
- Save updates the chart on every dashboard that uses it. Check those dashboards before changing groups or columns.
- Save as new saves a copy, using (copy) when the name is unchanged. Nothing on existing dashboards changes.
- ⋮ › Duplicate copies a chart from the list.
Delete a chart
Section titled “Delete a chart”- On the Charts page, open ⋮ › Delete.
- Read Delete chart and confirm only if you intend to delete it.
- If dashboards use it, DDL first lists them under This chart is on dashboards. Remove from dashboards and delete removes those tiles and the chart. Cancel keeps both.
Deletion needs edit access to the project and cannot be undone.
Charts made with the old editor
Section titled “Charts made with the old editor”Old charts have a Legacy badge, meaning Made with the old chart editor. Opening one explains whether it can be converted.
- A simple chart offers Convert to the new editor. You can adjust it, but the old version is unchanged until you click Save. Saving replaces the chart in place on its dashboards.
- Charts using unsupported parts, such as SQL, joins or another project’s data, remain read-only.
- Old charts keep working on signed-in dashboards. Public and embedded pages cannot show them; convert them first.
- A date without a time includes the whole day in the new editor. A converted chart may therefore count slightly different rows.
Charts from AI answers
Section titled “Charts from AI answers”Where AI answers are enabled and a model is connected, Save as chart on an Ask Data answer opens a draft:
- Click Save as chart and choose the Project.
- Click Open chart builder.
- Read Made from an AI answer — check the preview, verify its source and numbers, then click Save if it is right.
Nothing is saved before you confirm in the builder. The draft opens once, in that browser, within an hour. See AI Assistant.
Limits
Section titled “Limits”| Setting | Limit |
|---|---|
| Groups | 2 |
| Metrics | 1 to 5 |
| Columns in Rows of the source | 1 to 30 |
| Chart filters | 10 |
| Sort fields | 3 |
| Show up to | 1 to 1,000 rows; default 100 |
| Values in is one of | 100 |
| Series drawn | 12 |
| Pie slices before Other | 8 by default; adjustable from 2 to 20 |
| Pivot columns drawn | 50 |
| Chart query time | 10 seconds |
| Chart loads | 120 per minute per person |
Troubleshooting
Section titled “Troubleshooting”| Problem | Cause and fix |
|---|---|
| New chart is missing | You need Modify Project to create and save charts. |
| A node is missing from Data | Run it successfully first. Source-connection and transfer nodes cannot be charted; choose the node holding their data. |
| Column “…” is not in the source | A column was renamed or removed upstream. Choose an available column. |
| The data of this chart is being updated | Wait for the source to finish, then try again. |
| The server is busy | Other charts are running. Wait a few seconds. |
| First N rows | The result reached Show up to. Raise it or filter the data. |
| Number can only be split by a date column | Remove the group or choose a date column. |
| A converted chart shows different numbers | Check date filters: a date without a time covers its whole day. |